Topping out of Sherbourne House, Coventry


Yesterday, K2 celebrated the topping out of Sherbourne House - the new student accommodation in Coventry. The topping out represents the completion of the structural construction phase of the new 140 studio accommodation. 

K2  are providing project management and cost consultancy services respectively, working with our client, Axo Student Living, from initial concept design through to completion. This includes overseeing the design development, planning permission award and procurement of the construction works to the current construction phase.

The modular five storey student building is an extension to the current student accommodation that is due to be completed in time for the student intake in September 2016.



Welcome to Angelo Deligatos, our new Quantity Surveyor

Introducing Angelo






“I’m the new Quantity Surveyor at K2 and I’ll be working on Greenwich Wharf and Severalls Hospital. I have circa 6 years experience in consultancy, mainly in the South African commercial market and some retail and residential projects. I moved to the UK in 2015 in order to start a new life for myself and further my career.

I’m a sociable person and enjoy watching soccer (I mean Football), rugby and basketball, and play the occasional social game with friends.

I look forward to getting to know everyone and contributing to the company’s growth.”


Wednesday, 13 April 2016

K2 visits IET, Savoy Place


Recently, the K2 team had the opportunity to visit the £20m refurbishment and extension of the IET - Institution of Engineering and Technology, headquarters building and conference facilities.




The project involved refurbishment, reconfiguration and extension of the landmark institution headquarters in Savoy Place, overlooking the River Thames.


London's newest roof terrace, a breathtaking space with panoramic views
K2 provided Quantity Surveying services and were involved in Cost Management and Commercial Management for the enabling works and main reconstruction works.


Externally the works comprise cleaning / repairs to elevations & roof,  new double glazed windows and construction of a new roof terrace.

Internally, the works include a new lecture theatre constructed within the lightwell to the centre of the building above the existing lecture theatre.

This entails new structure being incorporated through existing retained accommodation down to Basement level. The entrance reception, lecture theatre, library, offices, kitchens, toilets, back of house areas and circulation are all refurbished with historic elements retained.


State-of-the-art lecture theatres 





Richard Mould, Associate at K2 Rider Hunt said:
“The project is a reflection of the strong alliance and teamwork between the client, IET, the design team, Project Manager, Contractor and K2 Rider Hunt.  Having worked closely with the IET since 2011, we recognised this was far more than a construction refurbishment project – and we maintained a constant dialogue with representatives from the IET from the outset."






More about IET London: Savoy Place
IET reopened for events, following over two years of closure. The refurbishment saw the venue increase its capacity and offer more cutting-edge technology for events. The Kelvin Lecture Theatre, which has retained its original mahogany panelling, now seats 451 delegates, while the new, more contemporary Turing Lecture Theatre has opened on the second floor with space for 190. Both offer live HD broadcast, streaming and filming capabilities. The windows in the revamped Riverside Room and Maxwell Library have been lengthened to maximise views over the Thames.

Wednesday, 6 April 2016

Planning permission granted for Phase 2 of Nine Elms Development


The next stage of the Nine Elms development has obtained planning permission to provide a further 349 units.


K2 is providing Project Management and Cost Management Services to Bellway Development on the first phase of Nine Elms. The next phase is a joint venture with L&Q (a G15 Housing Association) on the adjacent site, to deliver a further 349 units.

Planning consent was secured last week and works on the commencement of the design and procurement will commence in the next couple of weeks.




Tuesday, 5 April 2016

New project: Chobham Manor Residential Development

K2 has been appointed to oversee the schedule management for Taylor Wimpey's' prestigious Chobham Manor residential development located adjacent to the Olympic Velodrome.

Constructed in three phases, K2 has been appointed to provide detailed construction schedules for Phase 1 which includes a combination of flats, maisonettes, and townhouses totalling 259 new homes.

Andy Mason, Associate Director at K2 said:
"This is yet another exciting appointment for K2 in the residential sector and an opportunity to again demonstrate our ability to pragmatically apply specialist programming and controls tools to enhance efficiency, reduce delivery times and lower out- turn cost."
Destined to become one of London’s most sought - after addresses, Chobham Manor is the first neighbourhood to be built on the Queen Elizabeth Olympic Park.

There will also have more than 300 shops on their doorstep – as well as restaurants, bars, and entertainment including a bowling alley, casino, and 17-screen cinema complex – at Westfield Stratford City.

The site is being developed by Chobham Manor LLP, a joint venture between London & Quadrant and Taylor Wimpey.


 Images are Artist Impressions courtesy of Taylor Wimpey

Welcome to Guy Ekins, our new Senior Project Planner


On behalf of the K2 team, we would like to extend a warm welcome to Guy Ekins, our new Senior Project Planner.


Guy has joined K2 to assist in the planning process on selected projects and has been specifically recruited to work on the Chobham Manor project located close to the Olympic park in Stratford.

Guy graduated in Civil Engineering from the University of Surrey longer ago than he cares to remember. He has spent over thirty years in the Design, Procurement and Construction of a wide variety of projects in the Oil, Gas, and Power generation industries working successively as Construction Engineer, Site Cost Engineer, Planning Engineer, Management Systems Engineer and Project Controls Engineer. Before working as a Project Controls consultant, he served ten years as Manager of Planning for Mitsui Babcock Power Ltd.

A qualified ECB cricket coach, Guy also enjoys a game of tennis. Hobbies include campanology, bridge and going for walks - usually with two miniature Shetland ponies.

Tuesday, 22 March 2016

K2 is pleased to once again part sponsor the British Sprint Championship contender Steve Miles.



An interview with Steve Miles


John Setra, MD K2 Consultancy with Steve Miles


Tell us about yourself? How did you get involved in competing?
"I've always enjoyed practical playing with cars and built a kit car some 20 years ago, and just stepping up the speed and thrill, since 2000 I have been competing in the British Sprint Championship in a single seater racing car.  I am the driver, mechanic and I’ve developed the car into one of the top three fastest two litre racing cars in the country."
What is sprinting?
"Sprinting is a ‘car against the clock’ discipline and we typically run just under 2 laps from a standing start. 0-60mph is around 2.8 seconds and peak speeds of 155mph, so enough to keep you concentrated!"
How have you been doing in the races previously?
"Last year I came 5th place and so will be running number 5 on the car in 2016. There are often F1 engined cars to compete against which is always satisfying when you can beat them."
What are your goals for 2016?
"This year I am looking to beating last year’s personal bests and seeing where we end up overall – top 2 litre would be the target.
I am really excited about the season as the aerodynamics of the car have hopefully been significantly improved, which should result in lower lap times."
Tell us about the season and where the races will take place?
"Typically the season runs from March – October and covers the whole of the UK, including Northern Ireland we shall be competing at the big circuits during the season." 
Here is the schedule:
28.03.16  Croft
21.05.16  Snetterton
22.05.16  Snetterton
04.06.16  Pembrey
05.06.16  Pembrey
18.06.16  Anglesey
19.06.16  Anglesey
30.07.16  Knockhill
31.07.16  Knockhill
06.08.16  Kirkistown
07.08.16  Kirkistown
11.09.16  Blyton Park
01.10.16  Anglesey
02.10.16  Anglesey 
If people want to watch a race where can they get more information about attending?
"Drop me a line at smiles@moleracing.com or have a look at the website, www.moleracing.com
.... and finally why “Moleracing”?
"I was called ‘moley’ for years on account of what I look like first thing in the morning without my glasses!"
We also interviewed John Setra, MD at K2 ... 

How long have K2 been associated with Mole Racing?
"As good friends, Steve and I have known each other for nearly 30 years!  K2 have supported Mole Racing for over 5 years now and have seen massive improvements in both the car & driver!"
Do you have any forecasts for this season?
 "Yes – definitely a top 6 finish this year, given the big improvements to the car over the winter season."


To keep up to date with Steve’s progress visit: www.moleracing.com
Or follow him on twitter @moleracing

Followers

©2016 PFD. Powered by Blogger.

About Us

My Photo
K2 is a progressive and dynamic organisation who thrives on delivering challenging projects for demanding clients. We are a team of experienced project managers and construction professionals who have the capability of delivering projects from £1m to entire programmes of work in excess of £500m.




K2bannerwebsite